Binnacle

Solution 04 · Operations & Commercial

Connect each voyage to its operational, environmental and commercial result.

Binnacle connects voyage and noon-report records with dry-dock, environmental work, Carbon Intensity Indicator (CII) views, port disbursements, fixtures and laytime.

A miniature vessel travelling along an engraved route.

Capabilities

See voyage facts alongside environmental, port-cost and commercial results.

(04)
01

Voyage context

Keep daily operating facts attached to the voyage.

Plans, port calls, bunker stems, off-hire periods and noon reports provide the shared context for operational and commercial review.

  • Voyage and port-call lifecycle
  • Position, speed, distance and fuel
  • Bunkers and off-hire
02

Environmental record

Turn recorded activity into inspectable indicators.

Noon and bunker records support annual emissions views, CII ratings and indicators for relevant reporting regimes.

  • CII and annual emissions views
  • EU ETS and FuelEU indicators
  • IMO DCS and EU MRV views
03

Port and project cost

Bring port calls and dry-dock decisions into cost control.

Port disbursements support estimate, funding, final-account validation and reconciliation. Dry-dock scope, quotes and award remain visible against budget.

  • PDA and FDA workflow
  • Deterministic validation findings
  • Dry-dock scope and quote comparison
04

Commercial result

Measure the fixture against what happened.

Fixture terms, voyage revenue and cost, Statement of Facts and laytime events help calculate demurrage or despatch from a traceable timeline.

  • Voyage, time and bareboat fixtures
  • Estimated versus actual result
  • Laytime timeline and calculation

Connected workflow

From voyage plan to commercial result

  1. 01Plan voyage and port calls
  2. 02Capture noon and bunker data
  3. 03Record port and off-hire events
  4. 04Calculate environmental views
  5. 05Reconcile port and voyage costs
  6. 06Review profitability and laytime

Important context

01

ADVISORY — NOT a class-approved loadicator. Cargo, stowage, stability and ballast outputs require professional verification.

02

Environmental and regulatory tools support the workflow; they do not replace statutory verification.

Operations & Commercial · Live walkthrough

See this connected to the rest of your operation.

We will shape the walkthrough around your fleet, owner structure and the areas your team wants to improve.

Request a live walkthrough